With regards to a damaged building, a drying and monitoring programme will be discussed with the policyholder and the technician will arrange to regularly monitor the reduction of moisture in the buildings structure and air.
Unfortunately it is extremely difficult to determine the exact length of time it will take to dry a property, as this can depend on several factors including the depth of any standing water, the length of time the structure was submerged or wet and the structural material used, some of which create vapour barriers preventing evaporation of moisture. Regular monitoring will provide an on-going record of the progress.
It is essential that the drying equipment installed is used as directed by the technician, as the longer the equipment is allowed to operate the shorter the drying time. Electricity consumed by the equipment can normally be reclaimed from your insurers by making a note of the meter reading prior to the use of the drying equipment.